日韩欧美亚洲国产91-日韩国产欧美精品一区二区三区-日本一区二区三区精品免费-一区二区三区中文字幕av

Service Tel:0510-85251139

0510-85310583

    • Contacts:Miss Yang/
                          Jane Huang
    • Phone:0510-85251139/
                 0510-85310583
    • Fax:0510-85305960
    • Email:julia@wxyinye.com/
                   jane@wxyinye.com
    • Zip Code:214000 
    • Address:No. 30, Xinzhai Road, Shuofang, New District, Wuxi, Jiangsu, China 

News Center

your location:Home > News Center

Precision gear box compressor cold start

time:2013-1-11 Click:1352次

Jiangsu New Silver Leaf Transmission Ltd compressor precision gearbox cold start, follow these steps:
Cold start (in the cabin and the gearbox oil sump temperatures between -15 ° C and 0 ° C)
Start heating system (temperature ≥10 ° C again when stopped)
When sump temperature reaches ≥0 ° C, the pump starts to run low level.
Low-speed operation mode no-load operation.
After the sump temperature reaches ≥5 ° C, it can take 25% of the rated load operation.
Absolutely not allowed in the lubricating device is not running, it is running with load

Products Navigation